Rolls become brittle and may crack at low temperatures.
How to install mineral guard roll roofing.
Cut a hole in a piece of roofing about 2 feet wide and slip it over the pipe.
Be especially careful when installing mineral guard roll roofing in temperatures below 45 f 7 2 c.
It also helps if you first install a layer of roofing felt.
For extra durability you may install roll roofing in two layers.
The roof area is 14 ft.
You can get roofing cement at the local hardware or building supplies store.
The piece should overlap the lower course by at least 4 inches.
Apply roofing cement to the roof.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
The strips should always be horizontal.
Use a trowel to scoop up the roofing cement.
The following is excerpted from gaf s roll roofing installation instructions cited below.
Puting the weather watch rolled roofing material on was real easy and fast to install.
The roofing screws were 1 1 2 inch and went thru the drip edge and into the stud below.
Full installation guide for low slope.
Spread the roofing cement along the edges of your roof so it s about 1 8 1 4 inch 3 2 6 4 mm thick.
Cements become viscous and difficult to apply at low temperatures.
Gaf mastering the roof chapter 14 the liberty system is designed for both new roofing and re roofing applications.
This video demonstrates proper application techniques for tarco fiberglass mineral surfaced roll roofing.
Cut a hole in the roll roofing and slip it over as well.
Store all rolls and cements for at least 24 hours at or above 55 f 12 8 c prior to their.