Install the starter course.
How to install drip edge flashing on roof.
Place a nail at one end then the other.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
Learn more about drip edge at.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
You may need to nail through the starter strip into the drip edge.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
This will allow for expansion and contraction and prevent buckling.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Slide the corner tight to the fascia.
Using drip edge with a nailing edge approx.
How to install drip edge flashing on a roof hunker.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The starter course is comprised of a shingle that s roughly half the width of the field shingles.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.