Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
How to install corrugated iron roofing.
The waterproof quality can be even enhanced by using coatings such as epoxy or ceramic.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Complete the first row.
For walling you may use either crest or valley fixing.
Then cover the entire roof with a layer of insulation and secure it with a staple gun.
To maximise watertightness always place roof screws through the crests.
Buy the metal panels.
Next pre drill holes on the end and side ridges of the panels spacing the holes 6 to 8 inches apart.
Install a corrugated panels on gable roofs usually begins on one side of the roof working in the opposite direction of the prevailing wind.
Before you start to install corrugated metal roofing you need to figure out how much you need.
Properly installing corrugated roofing will prevent you from getting this issue and keep your building dry.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Multiply those numbers and then double the result for the square footage of your roof.
Side laps should still face away from the wind.
Install the roofing screws vertically along each rib in the panel.
How to install corrugated iron roof sheets.
Lay the roofing felt.
1 tools required for installing corrugated metal roofing.
Lay and secure the first metal panel.
Despite being lightweight corrugated metal roofs have ridges and grooves that contribute to their long lasting life.
Before you install metal roofing repair any damage to the wood under the shingles.
Our products are pierce fixed to steel or timber supports.
Next use 1 inch nails to secure some metal edging to the perimeter of the roof.
Fastening sheets to supports.
Finish the first side of the roof.
Measure the length of the roof and the breadth of one side.
You can place screws through the crests or in the valleys.
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.
On hip roofs this crew prefers to begin at the center and work outward.