A 1 2 1 slope means the excavation must be sloped 1 2 unit for each 1 unit of depth.
How to figure volume for a sloped concrete wall.
Use our concrete slabs calculator or estimator as a guide for how much concrete mix you need for your project.
Concrete is ordered by volume in cubic yards.
Calculating wall studs drywall ready mix tape joint compound nails screws.
One tank in the diked area note that the length width and height of the dike must be measured on the inside not the outside of the dike.
For large concrete jobs four cubic yards or more the concrete should be delivered by a ready mix truck.
Enter dimensions in us units inches or feet or metric units centimeters or meters of your concrete structure to get the cubic yards value of the amount of concrete you will need to make this structure.
Area of rectangle length x breadth the volume of concrete length x breadth x depth 6x5x0 15 4 5m 3 hence 4 5m 3 of concrete is required to build an above slab.
How do i calculate the volume of my containment dike.
Please enter length in foot.
Input length width and depth of the area.
For a 10 depth the slope will extend within 5 of the edge of the excavation.
This calculator is to be used as an estimating tool only.
This concrete calculator will help you in estimating the amount of concrete needed for your project.
All concrete is estimated in cubic yards one cubic yard 27 cubic feet.
It is recommended depending on the job you are doing to add anywhere from an extra 4 to 10 to your concrete order to make sure you have enough concrete to finish the job.
The amount given as needed does not include any waste.
To find the area of the face of the wall i drew a horizontal line across the wall to divide the face into a rectangle and a triangle.
Calculate volume of square slab calculator use.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
After you pick the material you will need to figure out exactly how much of it you will need for your concrete project.
1 measure the length of the dike wall in feet a in the formula.
Calculate the volume in cubic feet l x w x d of the area for which you need fill material.
Input length and width of the area.
The volume of concrete needed is the area of the face of the wall times its thickness of 12 inches.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
The volume of concrete area of rectangle x depth.
Calculation of volume of concrete for the column.
The calculator will automatically estimate the number of cubic yards of concrete that will be required.
Calculate volumes for concrete slabs walls footers columns steps curbs and gutters.